T5 Sculptures on esi

Comments (0)Published by Louise Scott on January 16 2014 04:16 in Floristry | General | GRP Planters | Interior Design | Interior Landscaping | Landscape Architecture
Tags: , , , , , , , , , , , , , , , , , , ,

T5 on esi [CLICK HERE!]

 

 

On esi we have just uploaded our case study of the T5 sculptures we completed for Heathrow’s Terminal 5 building. Have a look at the photos and the process we undertook to complete this fantastic job. While you are on our esi profile you can look through the rest of our case studies and products and each page link directly with our website so that you can buy what you see or arrange to get a quote from one of our managers for any bespoke job that you may wish to be undertaken.

 


Not Just Planters .. Terminal 5 Bespoke Sculptures

Comments (0)Published by Louise Scott on December 11 2013 06:43 in General | GRP Planters | Landscape Architecture
Tags: , , , , , , , , , , , , , , ,

Livingreen Design were approached a few weeks ago to create a free standing T and 5  for use with the Christmas display outside of Heathrow’s Terminal 5 building. We were given a week to create the whole project and as this was an incredibly tight turnaround that the entire project was produced out of normal hours. The full team committed to the extra work and got straight on the project  The idea was passed by  us and our graphics assistant then mocked up how it would look as the display was required to be 2.5 metres tall and the clients were having difficulty picturing the concept.

 

Once they agreed to the look of the planters our CAD technician then drew up 3D models and technical drawings for production. The technician had to include a steel pole structure so that the planters wouldn't fall over in a high gust of wind, as glass fibre is incredibly lightweight. Each mould was then constructed by hand by our experienced workshop technicians and so that the planter’s construction could begin. After, 90 hours of hard and enduring labour we were then able to texture them in our standard Brilliant White finish. Once dry we then wrapped them with great care and it took 8 men to load them into a truck for delivery; our technical director then drove from Edinburgh all the way down to Heathrow to deliver them personally, on site at 10pm on a Sunday.

 

http://www.livingreendesign.com/bespoke-projects.htm